www.ipervoice.co.uk

  • Increase font size
  • Default font size
  • Decrease font size
Home Ipervoice Site Watch

Dandara Site Watch


Dandara are an award winning creator of high quality residential and commercial developments including, Image, which is a mixed use development of one and two bedroom apartments situated in the heart of Hemel Hempstead combining new build and restoration. The Image Development features a 22-storey tower created by the dramatic transformation of the iconic 20-storey Kodak building with 240 apartments along with five new buildings totalling 434 apartments. 

To follow the phased IPervoice installation simply view the development details below to find out
why IP is the most flexible and sustainable way in providing controlled access for the demanding needs of a large multi occupancy housing development.



Building B is the first of the phased blocks where the IPervoice system has been installed
and where the network begins.
The installation comprises of one main entrance IPervoice IP digital panel serving 34 apartments with five additional controlled entrances with IP readers. The server for the system is temporally positioned within this block but will ultimately end up in the Concierge of Block E the Kodak building. With Broadband connection in Block B it is possible to remotely connect providing remote programming of tokens or new devices such as IP readers or additional IP entrances panels which need connection to the network. The network will be extended as each phase is installed.



Building F is the second of the phased blocks where the IPervoice system is being installed.
The installation comprises of two main entrance IPervoice IP digital panel serving 23 apartments with one additional controlled entrance with IP readers. The server for the system is positioned within block B but will ultimately end up in the Concierge of Block E the Kodak building. With Broadband connection in Block B it is possible to remotely connect providing remote programming of tokens or new devices such as IP readers or additional IP entrances panels which need connection to the network. The network will continue to be extended as each phase is installed.



Building G is the third of the phased blocks where the IPervoice system is being installed.
The installation comprises of two main entrance IPervoice IP digital panel serving 25 apartments with three additional controlled entrances with IP readers. The server for the system is positioned within block B but will ultimately end up in the Concierge of Block E the Kodak building. With Broadband connection in Block B it is possible to remotely connect providing remote programming of tokens or new devices such as IP readers or additional IP entrances panels which need connection to the network. The network will continue to be extended as each phase is installed.

 

 

Newsflash

Since the successful launch of IPervoice in 2009 we have had enquiries and quoted projects in excess of £4M.
Visit our main web site at
www.urmet.co.uk for more information on associated products.